Geotechnical
Geotechnical knowledge about the soil is basis tin order to acquire a sustainable infrastructure project. JUN deliver geotechnical expertise within all phases of a civil works project.
SUPERVISOR AND COORDINATION
- Take position as supervisor for geotechnics
ROAD UTILITY DISCIPLINE
- Compose geotechnical drilling program based on existing data
- Compose geotechnical reports (GIR and GDR)
- Evaluate challenges with water and a need of groundwater lowering
- Pavement dimension and calculation
- Evaluate need or possibility of lime stabilization
- Geotechnical site supervision
- Review of QA documentation
CAD/BIM
- Quantities from test borings
- Compose drawings for authority applications
- Drawings for construction
- Compose models for use in construction
THE GREATER COPENHAGEN LIGHT RAIL
The Greater Copenhagen Light Rail (L3) will be a new established 28km rail between Ishøj (South) going northbound to Lyngby/Danish Technical University. L3 will go through 11 different municipalities. The light rail corridor follows Ring 3 crossing several S-train stops, including Herlev and Buddinge S-train stations. The light rail carriages will reach a max. speed of 70 km/h, and stop at 30 new stations along the 28km light rail corridor.
KALKSTABILISERING v/DÆMNINGSOPBYGNING
På banestrækningen mellem Ringsted og Rødby foretages der en hastighedsopgradering fra den nuværende hastighed på 120-160 km/t til 200 km/t. Dette medfører en del af banen sideflyttes, hvorfor der skal etableres nye dæmningsudvidelser.